- Drill hole GD-26-431 intersected two neighbouring broad mineralized intervals that are part of the Bonanza Zone in the western fringes of the mineralized system, see Figures 1a - 1c.
asserted
that → intersect → Figures
- The first interval assayed 9.12 g/t AuEq over 11.27 meters, including 13.89 g/t AuEq over 7.14 meters that consists of stockwork and breccia veins associated with calc-silicate and biotite alteration with Visible Gold to the Naked Eye (VG-NE), galena, sphalerite, and pyrrhotite mineralization;
- The second interval assayed 4.70 g/t AuEq over 3.03 meters, within a broader interval of 1.08 g/t AuEq over 20.00 meters that is proximal to the Big Bulk Zone.
asserted
that → assay → Zone
In this interval stockwork veins and veinlets are associated dominantly with biotite, sericite alteration and pyrrhotite.
asserted
veins → associate → biotite
- Accompanying infographics are available at:
asserted
infographics → accompany → ?
- Drill hole GD-26-431 intersected two neighbouring broad mineralized intervals that are part of the Bonanza Zone in the western fringes of the mineralized system, see Figures 1a - 1c.:
asserted
that → intersect → Figures
The first interval assayed 9.12 g/t AuEq over 11.27 meters, including 13.89 g/t AuEq over 7.14 meters that consists of stockwork and breccia veins associated with calc-silicate and biotite alteration with Visible Gold to the Naked Eye (VG-NE), galena, sphalerite, and pyrrhotite mineralization;
- The second interval assayed 4.70 g/t AuEq over 3.03 meters, within a broader interval of 1.08 g/t AuEq over 20.00 meters that is proximal to the Big Bulk Zone.
asserted
that → assay → Zone
In this interval stockwork veins and veinlets are associated dominantly with biotite, sericite alteration and pyrrhotite.
asserted
veins → associate → biotite
Accompanying infographics are available at:
asserted
infographics → accompany → ?
- Drill hole GD-26-431 intersected two neighbouring broad mineralized intervals that are part of the Bonanza Zone in the western fringes of the mineralized system, see Figures 1a - 1c.:
asserted
that → intersect → Figures
The first interval assayed 9.12 g/t AuEq over 11.27 meters, including 13.89 g/t AuEq over 7.14 meters that consists of stockwork and breccia veins associated with calc-silicate and biotite alteration with Visible Gold to the Naked Eye (VG-NE), galena, sphalerite, and pyrrhotite mineralization;
- The second interval assayed 4.70 g/t AuEq over 3.03 meters, within a broader interval of 1.08 g/t AuEq over 20.00 meters that is proximal to the Big Bulk Zone.
asserted
that → assay → Zone
In this interval stockwork veins and veinlets are associated dominantly with biotite, sericite alteration and pyrrhotite.
asserted
veins → associate → biotite
- Accompanying infographics are available at:https://www.globenewswire.com/NewsRoom/AttachmentNg/209eb3bd-a4b2-4840-b723-ecf5daf3d8f8https://www.globenewswire.com/NewsRoom/AttachmentNg/80646156-e00c-485c-ab35-3e7f9959dccehttps://www.globenewswire.com/NewsRoom/AttachmentNg/db9ea5d1-f823-4933-b2ab-95fcdaa90c1f
*For reported assay intervals and AuEq calculation please see QA/QC Section on page 16.
- Drill hole GD-26-442 intersected 8.35 g/t AuEq over 4.15 meters, including 31.42 g/t AuEq over 1.00 meter.
asserted
hole → accompany → meter
This intercept is part of the new 100 meter Bonanza Zone expansion step-out to the north in 2026, where mineralization consists of quartz-sulphide veins associated with localized biotite and sericite alteration, VG-NE, galena, sphalerite, and pyrrhotite; see Figures 2a and 2b.
asserted
mineralization → consist → 2a
- Accompanying infographics are available at:
asserted
infographics → accompany → ?
Drill hole GD-26-442 intersected 8.35 g/t AuEq over 4.15 meters, including 31.42 g/t AuEq over 1.00 meter.
asserted
hole → intersect → meter
This intercept is part of the new 100 meter Bonanza Zone expansion step-out to the north in 2026, where mineralization consists of quartz-sulphide veins associated with localized biotite and sericite alteration, VG-NE, galena, sphalerite, and pyrrhotite; see Figures 2a and 2b.
asserted
mineralization → consist → 2a
- The expanded high-grade core of the Bonanza Zone is located above the valley floor, potentially making it a great target for initial underground mining operations using gravity methods.
- Drilling conducted during the 2026 program intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Bonanza Zone by 750 meters to the southwest, 100 meters to the west, 100 meters to the north and 160 meters to the northeast.
asserted
Drilling → expand → northeast
The Bonanza Zone remains open for expansion and assays are pending; see Figure 3.
asserted
assays → remain → Figure
- An accompanying infographic is available at:https://www.globenewswire.com/NewsRoom/AttachmentNg/11f5b617-56df-4cdd-8814-5005e168c88f
-
asserted
infographic → accompany → :
The expanded high-grade core of the Bonanza Zone is located above the valley floor, potentially making it a great target for initial underground mining operations using gravity methods.
-
asserted
it → expand → methods
Drilling conducted during the 2026 program intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Bonanza Zone by 750 meters to the southwest, 100 meters to the west, 100 meters to the north and 160 meters to the northeast.
asserted
Drilling → conduct → northeast
The Bonanza Zone remains open for expansion and assays are pending; see Figure 3.
-
asserted
assays → remain → Figure
An accompanying infographic is available at:
asserted
infographic → accompany → ?
The total footprint of the Surebet system is 2.01 km2, which represents a 12% increase compared to 1.8 km2 defined prior to the 2026 drilling season.
asserted
which → represent → season
Multiple drill holes intercepts from 2026 have expanded the Bonanza Zone to 1.51 km2 from 1.27 Km2 (a 19% increase) and the Golden Gate Zone to 1.17 Km2 from 0.85 Km2 (a 38% increase) and both remain open for expansion; see news August 24, 2026.
asserted
both → expand → news
- Visible Gold to the Naked Eye (VG-NE) has been intersected in multiple veins and shear zones from 52 out of 92 holes drilled in 2026 continuing to confirm consistency of gold mineralization widely disseminated throughout the Surebet system that remains open laterally and at depth; see Figures 4a - 4e.
asserted
that → intersect → depth
- Accompanying infographics are available at:
asserted
infographics → accompany → ?
- The expanded high-grade core of the Bonanza Zone is located above the valley floor, potentially making it a great target for initial underground mining operations using gravity methods.
- Drilling conducted during the 2026 program intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Bonanza Zone by 750 meters to the southwest, 100 meters to the west, 100 meters to the north and 160 meters to the northeast.
asserted
Drilling → expand → northeast
The Bonanza Zone remains open for expansion and assays are pending; see Figure 3.
asserted
assays → remain → Figure
- An accompanying infographic is available at:https://www.globenewswire.com
asserted
infographic → accompany → ?
The total footprint of the Surebet system is 2.01 km2, which represents a 12% increase compared to 1.8 km2 defined prior to the 2026 drilling season.
asserted
which → represent → season
Multiple drill holes intercepts from 2026 have expanded the Bonanza Zone to 1.51 km2 from 1.27 Km2 (a 19% increase) and the Golden Gate Zone to 1.17 Km2 from 0.85 Km2 (a 38% increase) and both remain open for expansion; see news August 24, 2026.
asserted
both → expand → news
- Visible Gold to the Naked Eye (VG-NE) has been intersected in multiple veins and shear zones from 52 out of 92 holes drilled in 2026 continuing to confirm consistency of gold mineralization widely disseminated throughout the Surebet system that remains open laterally and at depth; see Figures 4a - 4e.
- Accompanying infographics are available at:https://www.globenewswire.com/NewsRoom/AttachmentNg/02f64576-d934-475a-b5ab-ad05551b9c21https://www.globenewswire.com/NewsRoom/AttachmentNg/542966ff-a180-42bf-a10c-d58471d8313b https://www.globenewswire.com/NewsRoom/AttachmentNg/10ec6c46-0b77-4058-8357-3615df27fcb8 https://www.globenewswire.com/NewsRoom/AttachmentNg/2587185d-05e0-42d0-ac6b-1646c1ed32de https://www.globenewswire.com/NewsRoom/AttachmentNg/ef950518-4d81-47b6-964b-0d770d8f8f77
-
asserted
infographics → intersect → https://www.globenewswire.com/NewsRoom/AttachmentNg/ef950518-4d81-47b6-964b-0d770d8f8f77
The expanded high-grade core of the Bonanza Zone is located above the valley floor, potentially making it a great target for initial underground mining operations using gravity methods.
-
asserted
it → expand → methods
Drilling conducted during the 2026 program intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Bonanza Zone by 750 meters to the southwest, 100 meters to the west, 100 meters to the north and 160 meters to the northeast.
asserted
Drilling → conduct → northeast
The Bonanza Zone remains open for expansion and assays are pending; see Figure 3.
-
asserted
assays → remain → Figure
An accompanying infographic is available at:
asserted
infographic → accompany → ?
The total footprint of the Surebet system is 2.01 km2, which represents a 12% increase compared to 1.8 km2 defined prior to the 2026 drilling season.
asserted
which → represent → season
Multiple drill holes intercepts from 2026 have expanded the Bonanza Zone to 1.51 km2 from 1.27 Km2 (a 19% increase) and the Golden Gate Zone to 1.17 Km2 from 0.85 Km2 (a 38% increase) and both remain open for expansion; see news August 24, 2026.
asserted
both → expand → news
- Visible Gold to the Naked Eye (VG-NE) has been intersected in multiple veins and shear zones from 52 out of 92 holes drilled in 2026 continuing to confirm consistency of gold mineralization widely disseminated throughout the Surebet system that remains open laterally and at depth; see Figures 4a - 4e.
asserted
that → intersect → depth
…and 153 more, not listed.