Photo via The Sydney Morning Herald

To avoid an energy crunch, the Philippines could turn to this ancient, never-used nuclear plant

Read the original at The Sydney Morning Herald ↗
Cite

Regalado, F. (2026, September 21). To avoid an energy crunch, the Philippines could turn to this ancient, never-used nuclear plant. The Sydney Morning Herald. https://www.smh.com.au/world/asia/to-avoid-an-energy-crunch-the-philippines-could-turn-to-this-ancient-never-used-nuclear-plant-20260921-p60z3q.html?ref=rss&utm_medium=rss&utm_source=rss_feed

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

The Sydney Morning Herald · collected 2026-09-21 · by Francesca Regalado

Quick Summary

Noel Germano manages the mothballed Bataan Nuclear Power Plant near Manila, a facility completed but never activated in 1984 during Ferdinand Marcos Sr.'s regime. President Ferdinand “Bongbong” Marcos Jr., elected in 2022, is now considering reviving the plant to address energy security issues amid global oil price shocks and local concerns about electricity shortages. However, experts caution that bringing the plant back online would be expensive and challenging due to safety concerns and public skepticism over nuclear power following past corruption allegations.
Written by AI on 2026-09-21, from this article's own text only (the story summary below draws on all the coverage).

AI analysis

Story summary

In the Philippines, Noel Germano leads tours through the mothballed Bataan Nuclear Power Plant, located west of Manila. Built in the 1970s by then-president Ferdinand Marcos Sr., the plant was intended to usher in a modern era for the country but only one reactor out of four planned units was completed in 1984 and never activated due to various criticisms, including corruption allegations tied to the project. Recently, Marcos Jr., who succeeded his father as president in 2022, is reconsidering nuclear power options to address energy shortages, potentially reviving the Bataan plant despite its controversial history and maintenance challenges.

Written for “Philippine Nuclear Plant Revival” on 2026-11-02, grounded in this article and the 0 other(s) covering the same event.

Story

📰 Philippine Nuclear Plant Revival
Politics · 1 article(s) covering the same event.

Compared with similar articles

Nothing to compare against. No article is close enough to this one for the pipeline to have linked or judged the pair.
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
63
sentences that state something as happening or true
Uncertain
8%
5 of 63 hedged ("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
61/100
The Sydney Morning Herald's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
1
Politics
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-09-21 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

The Sydney Morning Herald · 5845 article(s) · 15 correction(s) detected
Running correction rate · 15 correction(s)

Who wrote this

Francesca Regalado
1 article(s) here · 1 carrying a prediction
🔮 Reviving the Bataan plant might prove a hard sell in a cash-strapped country, especially to the Filipinos who see it as a reminder of the corruption and repression of the Ferdinand Marcos snr era.
The only article under this byline in the corpus.

Topics

Bataan Manila Morong Philippines Ukraine

Subjects

Philippines GPE · 6× Morong GPE · 4× Bataan GPE · 2× Ferdinand Marcos PERSON · 2× Manila GPE · 2× Marcos PERSON · 2× Ferdinand “Bongbong” Marcos PERSON · 1× Germano PERSON · 1× Noel Germano PERSON · 1× Ukraine GPE · 1×

Narrative

The design was updated, and work resumed the next year, but safety was just one of the criticisms: Marcos faced persistent allegations of corruption related to the project, including that the American company Westinghouse had given him millions of dollars in illegal payments to secure a contract to build the plant.
framing: assertive · carried by 1 article(s) · first seen 2026-09-21
🔮 Reviving the Bataan plant might prove a hard sell in a cash-strapped country, especially to the Filipinos who see it as a reminder of the corruption and repression of the Ferdinand Marcos snr era.

Claims (63 extracted, 5 hedged)

Noel Germano leads the way through the dark, airless hallways of the Bataan Nuclear Power Plant, an isolated compound west of Manila that was meant to be the first source of atomic energy in the Philippines. asserted
that → lead → Philippines
The plant has been mothballed for decades. asserted
plant → mothball → decades
A yellow radiation protection suit is only for display, unneeded by Germano, who manages the plant, or any of his seven engineers as they go about the Sisyphean task of manually turning thousands of analogue dials, switches and gears to prevent decay. asserted
they → manage → decay
The plant was heralded by president Ferdinand Marcos snr in the 1970s as a step into a prosperous, modern era for the Philippines. asserted
plant → herald → Philippines
Of its four planned reactors, only one unit was completed in 1984, and it was never switched on. asserted
it → plan → 1984
Decades later, his son – who was elected president in 2022 – has revived the country’s pursuit of atomic energy, and his government is exploring options including potentially reviving the plant in Bataan. asserted
government → elect → Bataan
The hulking concrete structure sits on an 800-acre site fenced off from the small seaside town of Morong. asserted
structure → sit → Morong
The plant’s grounds are still well maintained, but its interior, with the reactor that was designed to produce 621 megawatts, resembles a museum diorama. asserted
that → maintain → diorama
Bringing it to life is not impossible, but it is a tall and expensive ask, experts say. asserted
experts → bring → life
Marcos, a dictatorial leader who was in power from 1965 to 1986, wanted to diversify the Philippines’ energy sources to guard against global oil shocks like the one in 1973. asserted
who → want → 1973
His son, Ferdinand “Bongbong” Marcos, has had to deal with similar fallout from the wars in Ukraine and the Middle East. asserted
son → have → Ukraine
Reviving the Bataan plant might prove a hard sell in a cash-strapped country, especially to the Filipinos who see it as a reminder of the corruption and repression of the Ferdinand Marcos snr era. uncertain
who → revive → era
And the threat of nuclear catastrophe feels immediate for many residents of Morong just up the coast. asserted
threat → feel → coast
The project has never been free of scepticism, facing a number of questions from the beginning. asserted
project → face → beginning
Does the Philippines have enough expertise to run a nuclear power plant safely? asserted
Philippines → have → plant
Is it wise to build one in a part of the world where earthquakes and tsunamis are a constant threat? asserted
earthquakes → build → world
Can the country even afford it? asserted
country → afford → it
Ferdinand Marcos snr’s government secured financing for the plant through debt. asserted
government → secure → debt
Hundreds of engineers and technicians were sent abroad for training to build up a workforce capable of running a nuclear facility. asserted
Hundreds → send → facility
The site, on a peninsula across the bay from Manila, was chosen because there was abundant water to cool the reactor, and it was considered high enough to be safe from tsunamis, a constant threat given the region’s frequent earthquakes. asserted
it → choose → earthquakes
Construction began in 1976, bringing a windfall to many people in Morong and nearby towns who were hired to work on the project. asserted
who → begin → project
They included Valentino Tolosa, who said he could not believe his luck when, aged 18, he got a job as a cable puller. uncertain
he → include → puller
It paid about $US27 a day, 10 times the allowance he got from his mother, he said. asserted
he → pay → mother
Three years into the plant’s construction, more than 12,000 kilometres away in Pennsylvania, a reactor at Three Mile Island suffered a partial meltdown in what remains the worst nuclear energy accident in US history. asserted
what → suffer → history
It turbocharged the anti-nuclear movement in the Philippines, with activists regularly coming to Morong to campaign against the plant being built nearby. asserted
plant → turbocharge → Morong
Rumours also spread across the Philippines in the 1970s that the site was particularly dangerous because it sat above a fault line, and was 64 kilometres from Mount Pinatubo, an active volcano. asserted
it → spread → Pinatubo
Researchers from the Philippine Department of Science and Technology have since found no active fault lines under Bataan, and the site was unharmed by the volcano’s most destructive eruption since, in 1991. asserted
site → find → 1991
The first Marcos government, which displayed little tolerance for dissent, came down hard on the plant’s opponents. asserted
which → display → opponents
Pilar Nazareno, a resident of Morong, said dozens of her neighbours who had questioned the nuclear project at the time were taken by police or labelled communists by the government. asserted
who → say → government
Some residents pretended to attend Bible studies at a local church as cover for discussions about the plant, she said. asserted
she → pretend → plant
“It fell to the priests and nuns to teach us about the nuclear plant, and what would happen to us if it had a meltdown,” Nazareno, 68, said. asserted
Nazareno → fall → meltdown
The Three Mile Island accident led Philippine authorities to suspend construction at Bataan in 1979 for a safety review. asserted
accident → lead → review
The design was updated, and work resumed the next year, but safety was just one of the criticisms: Marcos faced persistent allegations of corruption related to the project, including that the American company Westinghouse had given him millions of dollars in illegal payments to secure a contract to build the plant. asserted
company → update → plant
By the time it was completed in 1984, the plant’s cost had more than doubled to more than $US2 billion. asserted
cost → complete → billion
It took two more decades for the government to pay off the accumulated debt. asserted
government → take → debt
Marcos was by then struggling for his political survival. asserted
Marcos → struggle → survival
In February 1986, he was overthrown and fled the country. asserted
he → overthrow → country
With its biggest backer out of office, the nuclear plant’s future was thrown into doubt. asserted
future → throw → doubt
“When the government changed, we already knew nothing would move forward at the plant,” said Antonio Corpuz, a chemical engineer who was appointed the plant’s manager in 1978. asserted
who → change → 1978
Two months after Marcos’ departure, a reactor exploded at the Chernobyl nuclear power plant in the Soviet Union, in what became the world’s worst nuclear accident. asserted
what → explode → Union
…and 23 more, not listed.
💬Give feedback
🕘History 🎫Support