Photo via The Sydney Morning Herald

Auric hits high-grade gold beyond WA Munda pit shell

Read the original at The Sydney Morning Herald ↗
Cite

Todd, A. (2026, September 24). Auric hits high-grade gold beyond WA Munda pit shell. The Sydney Morning Herald. https://www.smh.com.au/business/companies/auric-hits-high-grade-gold-beyond-wa-munda-pit-shell-20260924-p610ax.html?ref=rss&utm_medium=rss&utm_source=rss_feed

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

The Sydney Morning Herald · collected 2026-09-24 · by Andrew Todd

Quick Summary

Auric Mining has reported promising gold drill results at its Munda deposit near Widgiemooltha in Western Australia, indicating potential for expansion beyond the current pit design. Notable hits include a four-meter section with 10.49 grams per tonne (g/t) of gold and several other high-grade intercepts within or close to the planned open-pit area. Managing director Mark English emphasized these results as an encouraging start to a broader drilling campaign aimed at boosting resource estimates ahead of the mine's restart in 2027.
Written by AI on 2026-09-24, from this article's own text only (the story summary below draws on all the coverage).

AI analysis

Story summary

Auric Mining, an Australian gold mining company, recently announced significant high-grade gold discoveries near its Munda deposit in Widgiemooltha, Western Australia. The latest drill results include a four-meter section with 10.49 grams per tonne (g/t) of gold, located about 100 meters west of the planned open pit area. Additional notable hits were recorded at shallow depths, such as a 3-meter segment within a broader 15-meter interval yielding 5.56 g/t gold starting from just 6 meters below surface and another 4-meter section with 19.34 g/t gold beginning at 9 meters depth.

These findings suggest potential for resource expansion beyond the current pit design, which will be further evaluated through an extensive drilling program aimed at reducing development risks ahead of a mine restart planned in the near future. To support this growth, Auric Mining secured essential processing equipment worth around $15 million to $20 million for just $1.2 million, significantly enhancing its operational capabilities and financial position.

Written for “Gold Mining Expansion” on 2026-11-04, grounded in this article and the 0 other(s) covering the same event.

Story

📰 Gold Mining Expansion
Economy/Business · 1 article(s) covering the same event.

Compared with similar articles

Nothing to compare against. No article is close enough to this one for the pipeline to have linked or judged the pair.
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
18
sentences that state something as happening or true
Uncertain
0%
0 of 18 hedged ("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
61/100
The Sydney Morning Herald's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
1
Economy/Business
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-09-24 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

The Sydney Morning Herald · 6022 article(s) · 15 correction(s) detected
Running correction rate · 15 correction(s)

Who wrote this

Andrew Todd
31 article(s) here · 1 carrying a prediction
🔮 Hastings says testing and commissioning are on track to kick off in the first quarter, with first production expected to follow shortly after.
2026-10-28 · assertive framing · Hastings completes US$15M Thai rare earths plant deal
🔮 Houthi attacks on Saudi targets sent crude surging above US$113 a barrel, reviving fears that another energy shock could reignite inflation just as markets are hoping for interest-rate relief.
🔮 The company says it has now also established a permanent camp at Hook Lake, which it says will allow for resupply over winter and an earlier start to drilling in the 2027 season.
🔮 ‘(This) next step far more closely replicates the compaction, percolation and acid distribution inside a full-scale commercial heap leach.’Red Metal managing director Rob Rutherford The final validation is expected to build on Red Metal’s previously successful two-metre column program that delivered impressive neodymium extraction of up to 76 per cent and praseodymium extraction of up to 78 per cent from transitional ore.
🔮 Although the initial observations are considered encouraging, assays will have the final say.
🔮 Now boasting a market cap of around $300 million, Waratah could have plenty more upside.
🔮 The pain may be even worse for little brother Fortescue, with early forecasts suggesting its September quarter could deliver its first loss-making quarter in years — potentially the first since 2009, as some 67 consecutive profitable periods come undone.
🔮 The pain may be even worse for little brother Fortescue, with early forecasts suggesting its September quarter could deliver its first loss-making quarter in years — potentially the first since 2009, as some 67 consecutive profitable periods come undone.
🔮 The company’s latest induced polarisation (IP) and ground magnetic surveys have outlined a robust 1.5-square-kilometre chargeability anomaly coinciding with a one-square-kilometre magnetic anomaly beneath its Icebreaker discovery, suggesting the once gold-focused project could be emerging as a massive copper-gold system at depth.
🔮 Management says the findings could herald a new discovery with proper testing at depth, describing it as a substantial coincident anomaly in a largely underexplored part of the Eastern Goldfields.
2026-10-15 · assertive framing · Golden Dragon sniffs out 2.2km gold footprint in WA
Also by Andrew Todd
Hastings completes US$15M Thai rare earths plant deal
2026-10-28 · The Sydney Morning Herald
Red Metal scales up leach tests at QLD rare earths monster
2026-10-21 · The Sydney Morning Herald
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 31 articles by Andrew Todd →

Topics

Auric Auric Mining Australia Western Australia Widgiemooltha

Subjects

Auric ORG · 4× Munda GPE · 3× Auric Mining ORG · 2× Mark English PERSON · 2× ASX ORG · 1× Australia GPE · 1× Coolgardie GPE · 1× Western Australia GPE · 1× Widgiemooltha GPE · 1×

Narrative

A key piece of that puzzle fell into place recently when the company pulled off a mighty coup, snapping up a significant package of processing machinery for its Burbanks gold plant south of Coolgardie for just $1.2 million, against an estimated replacement value of between $15 million and $20 million.
framing: assertive · carried by 1 article(s) · first seen 2026-09-24
🔮 Auric Mining looks set to expand its Munda gold deposit near Widgiemooltha in Western Australia, following a suite of impressive recent drill results that included a four-metre hit at a hefty 10.49 grams per tonne (g/t) gold roughly 100m west of the planned open pit.
2026-09-24 · The Sydney Morning Herald
Auric hits high-grade gold beyond WA Munda pit shell · assertive framing

Claims (18 extracted, 0 hedged)

Auric Mining looks set to expand its Munda gold deposit near Widgiemooltha in Western Australia, following a suite of impressive recent drill results that included a four-metre hit at a hefty 10.49 grams per tonne (g/t) gold roughly 100m west of the planned open pit. asserted
that → look → pit
The high-grade extensional result came from a broad-spaced reverse circulation (RC) drilling program designed to shore up both the existing ounces and to test for resource growth beyond the current pit design. asserted
result → come → design
The close-spaced grade control drilling program, targeting the top 30m of the planned pit, also delivered a suite of impressive near-surface results, including a peak intercept of 15m running at 5.56g/t gold from just 6m. That interval also housed a richer 3-metre core at 19.30g/t. asserted
interval → target → t.
Other notable shallow hits included 4m at 19.34g/t gold from 9m and 9m at 7.82g/t from 17m. ‘The high-grade extensional 4m at 10.49g/t gold supports the potential to grow the Resource along strike beyond the current pit design. asserted
m → include → design
The company says the results are an encouraging start to a substantial drilling campaign aimed at de-risking the next stage of development ahead of a planned mine restart in 2027. asserted
results → say → 2027
Auric Mining managing director Mark English said: “These initial results are an encouraging start to our substantial drilling program at Munda. asserted
results → say → Munda
The high-grade extensional intercept of 4m at 10.49 g/t gold supports the potential to grow the Resource along strike beyond the current pit design, while the grade control results continue to demonstrate strong near-surface mineralisation within the planned open pit. asserted
results → support → pit
The work follows an exceptionally successful starter pit mining campaign at Munda which produced 8886 ounces of gold and outperformed its predictions by a whopping 46 per cent. asserted
which → follow → cent
After costs, the gold sold for a staggering $43.5 million, teasing at what is to come from the remaining 192,000 in-ground ounces grading 1.43g/t gold. asserted
what → sell → gold
Auric also pulled off its lucrative joint venture at the Jeffreys Find gold mine - completed earlier this year - banking $16.5 million in cash for the company from an initial investment of about $1.2 million. asserted
Auric → pull → million
The windfall has helped swell Auric’s war chest to almost $38 million, giving it plenty of financial firepower to roll out its near-term expansion plans across the Eastern Goldfields and pursue its ambition of becoming what the company calls “Australia’s next integrated mining house”. asserted
company → help → what
A key piece of that puzzle fell into place recently when the company pulled off a mighty coup, snapping up a significant package of processing machinery for its Burbanks gold plant south of Coolgardie for just $1.2 million, against an estimated replacement value of between $15 million and $20 million. asserted
company → fall → million
The bargain-basement buy is set to help bring the planned 600,000-tonne-per-annum carbon-in-leach processing plant to life in 2027. asserted
buy → set → 2027
Owning its own mill will allow Auric to control the full production cycle, processing ore from both Munda and its other nearby projects. asserted
Auric → own → Munda
With geotechnical diamond drilling now complete, the company expects to deliver a final pit design and an updated ore reserve estimate for Munda next month. asserted
company → expect → Munda
Auric appears to be ticking all the right boxes, from continuing to uncover high-grade ounces at Munda to securing a processing plant for a song. asserted
Auric → appear → song
With the pieces now falling into place, the company is gearing up for is likely an all-out gold assault when mining at Munda kicks back into gear in the new year. asserted
mining → fall → year
Is your ASX-listed company doing something interesting? asserted
company → list → something
💬Give feedback
🕘History 🎫Support