Mayoral candidate Bonnie Crombie says it’s time for an extension of the east-west Bloor-Danforth subway line to Mississauga’s city centre — and if elected she will launch a feasibility study and appeal to a subway-loving premier and a prime minister looking for nation-building projects.
“Vaughan has a subway and one is being planned for both Markham and Richmond Hill.
asserted
one → say → Markham
So why not Mississauga?” said Crombie in an interview.
asserted
Crombie → say → interview
“We need a completely integrated regional transit network.”
asserted
We → need → network
From LRT to subway: Crombie’s transit vision
The Hurontario LRT or Hazel McCallion line, which is currently under construction as a north-south spine that will extend through Mississauga’s city centre into Brampton, made sense at the time of planning more than a decade ago and was the more affordable option, Crombie said.
asserted
Crombie → extend → planning
“We didn’t have the density then, but we do have the density today and we have the demand for it,” she said, adding that the idea of a subway has been very popular as she speaks to people on the campaign trail.
asserted
she → have → trail
Carolyn Parrish, who is running for re-election as mayor, has been a fan of the idea of a Mississauga subway, and lamented that McCallion shot the idea down when she was mayor decades ago.
asserted
she → run → idea
But Parrish has also cited the hefty price tag as a barrier, unless the province is willing to pick up the tab of $1 billion per kilometre.
asserted
province → cite → kilometre
“Listen, if somebody is going to put a subway out to Mississauga, there’s no way anybody in their right mind would turn it down with traffic (as it is) now,” Parrish told Insauga last year.
asserted
Parrish → listen → Insauga
How the extension would actually work
In 2024, Toronto city council asked for a report on the prospect of a Line 2 extension to Sherway Gardens in south Etobicoke, an idea floated by George Smitherman in the 2010 Toronto mayoral election.
asserted
council → work → election
In Crombie’s vision, the line could go from Sherway to a spot around Dundas and Hurontario, and end in Mississauga’s city centre, with some elevated sections along the Dundas corridor.
uncertain
line → go → corridor
“I think the premier really likes to build subways,” said Crombie.
asserted
Crombie → think → subways
“I thought that this was something that is needed, desired here in Mississauga and would capture his interest as well.”
The political hurdles ahead
Crombie thinks the plan will intrigue Premier Doug Ford.
asserted
plan → think → Ford
She clashed with him when she was Ontario Liberal leader, prompting him to say he’d send “an army” to stop her being elected mayor over Parrish.
asserted
her → clash → Parrish
“I think the premier really likes to build subways,” said Crombie.
asserted
Crombie → think → subways
“I thought that this was something that is needed, desired here in Mississauga and would capture his interest as well.”
asserted
that → think → interest
She hopes Prime Minister Mark Carney would see the extension is as a “nation-building project … and, you know, maybe the two of them, the premier and the prime minister, could combine and fund this extension.”
uncertain
two → hop → extension
Crombie says that it could be built within a decade, and believes the ambitious idea will help persuade voters she deserves her old job back.
uncertain
she → say → job
“We are in the ‘magic marker phase’ of the election,” said Matti Siemiatycki, a University of Toronto expert in infrastructure and city planning, adding that a plan for a new subway is part of a time-honoured tradition of Toronto-area elections.
asserted
plan → say → elections
“Sometimes these proposals have a kernel of merit, and in practice they often end up being a bit of a distraction.
asserted
they → have → distraction
There is a need for better and more integrated transit all across the GTA including subways, he said, but the planning has been somewhat haphazard.
asserted
planning → be → subways
In that context, the idea could pick up steam.
uncertain
idea → pick → steam
“It’s entirely conceivable this gets built,” he said.
asserted
he → ’ → ?
“The politics of ‘everyone else is getting a subway, why don’t we have one,’ has been powerful in this region.”
asserted
we → get → region
The problem is that the cost of building subways is extremely high, with the Ontario Line ballooning to double the typically-cited $1 billion per kilometre, he said.
asserted
he → build → kilometre
The Ontario Line, Hurontario LRT and Yonge North extension are all facing delays.
asserted
Line → face → delays
“The thing we’re struggling with is how to prioritize investing scarce resources when we do have a provincial government that is really intent on building — and when an idea comes forward that’s appealing, they just go for it,” he said.
asserted
he → struggle → it
But voters need to remember that no matter what a mayor or would-be mayor says about a new subway, the actual decision lies at Queen’s Park, he said.
asserted
he → need → Park
Mississauga has also seen recent transit investment.
asserted
Mississauga → see → investment
In addition to the Hurontario LRT, Mississauga is working on a bus rapid transit corridor along Dundas Street through Cooksville.
asserted
Mississauga → work → Cooksville
The city is also making plans for a new downtown transit hub by Square One, with the hope that the plan for a downtown LRT loop will go ahead.
asserted
plan → make → loop
Jeff Casello, a transportation planning and infrastructure expert at the University of Waterloo, agrees there is a need for transit that doesn’t falter at municipal boundaries.
asserted
that → agree → boundaries
But he said there are questions that need to be asked about a subway extension, including whether a subway is the right mode for the number people who’d be making the trip, and how high the cost would be.
asserted
cost → say → trip
Running a portion of the line aboveground rather than underground would be cheaper, said Casello and tunnelling in Mississauga could be less challenging than in Toronto with its old water infrastructure.
uncertain
tunnelling → run → infrastructure
“The integration between the city of Toronto and its suburbs has to be better,” he said.
asserted
he → have → Toronto
“The GO network should be doing that, but we’re not doing it meaningfully.”
asserted
we → do → it