Photo via The Sydney Morning Herald

Level crossings on hold as Labor vows to fix Melbourne’s most unreliable train line

Read the original at The Sydney Morning Herald ↗
Cite

Hatch, P., & Delaney, A. (2026, September 28). Level crossings on hold as Labor vows to fix Melbourne’s most unreliable train line. The Sydney Morning Herald. https://www.smh.com.au/politics/victoria/level-crossings-on-hold-as-labor-vows-to-fix-melbourne-s-most-unreliable-train-line-20260928-p610v9.html?ref=rss&utm_medium=rss&utm_source=rss_feed

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

The Sydney Morning Herald · collected 2026-09-28 · by Patrick Hatch, Angus Delaney

Quick Summary

Victoria’s Labor government has pledged $80 million over two years to begin planning for duplicating Melbourne’s Upfield rail line, aiming to enhance capacity by 50% and reduce delays. Premier Ben Carroll says this move will save taxpayers $600 million compared to former premier Daniel Andrews’ level crossing removal plans. The project will delay eight level crossing removals along the Upfield line until 2033 when both projects are expected to be completed simultaneously, reducing overall costs and disruption for commuters in northern suburbs like Broadmeadows and Campbellfield. Treasurer Colin Brooks emphasizes that this approach makes “commonsense” financial sense while improving rail services for residents waiting for infrastructure upgrades since 2022.
Written by AI on 2026-09-28, from this article's own text only (the story summary below draws on all the coverage).

AI analysis

Story summary

Premier Ben Carroll's Labor government pledged $80 million towards a study on duplicating Melbourne’s Upfield rail line if re-elected. The current single-line track section between Gowrie and Upfield stations causes significant delays during peak times, reducing train capacity in northern suburbs like Broadmeadows, Dallas, Campbellfield, and Fawkner. This plan aims to increase service reliability and reduce wait times for commuters but will delay the removal of level crossings already planned by the previous government. The project is expected to cost an additional $600 million beyond the initial study phase if it proceeds as intended.

Written for “Upfield Line Delays” on 2026-11-01, grounded in this article and the 1 other(s) covering the same event.

Story

📰 Upfield Line Delays
Politics · 2 article(s) covering the same event. See how they differ ↓

Compared with similar articles

This article reads leans left and hedges 7% of its claims. Each row says how that neighbour differs.
ABC News (AU)
Hedges 0 of 3 claims Outlet record 68/100
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
43
sentences that state something as happening or true
Uncertain
7%
3 of 43 hedged ("reportedly", "may", "according to")
Leaning
Leans left
of the writing, not the subject · beta estimate
Publisher signals
61/100
The Sydney Morning Herald's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
2
Politics
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-09-28 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

The Sydney Morning Herald · 5737 article(s) · 15 correction(s) detected
Running correction rate · 15 correction(s)

Who wrote this

Patrick Hatch
10 article(s) here · 1 carrying a prediction
🔮 The first stop in trying to win over voters was Geelong’s University Hospital, where Carroll, flanked by Deputy Premier Gabrielle Williams and Health Minister Ingrid Stitt, announced Labor would spend $1.5 billion over four years to tackle chronic emergency department wait times.
🔮 One Nation is currently polling at a 23 per cent primary vote, according to the latest Resolve Political Monitor conducted for this masthead, suggesting the party will for the first time have a significant presence in the next Victorian parliament.
🔮 Grattan Institute housing expert Matthew Bowes said affordability and the supply of new housing would have declined more in response to rising interest rates and construction costs, if not for the state government’s overhaul of the planning system.
🔮 Party founder Pauline Hanson helped present the 93 candidates who will contest every lower house and upper house seat in the November 28 poll, while railing against the legacy of 12 years of Labor government.
🔮 Premier Ben Carroll will on Monday announce a funding commitment of $80 million over two years to kickstart work on building a second track on the Upfield line, which will slash wait times for commuters in suburbs including Broadmeadows, Dallas, Campbellfield and Fawkner.
🔮 The impact compounds as the years roll on, then steams home when those left behind realise all they once knew might one day be gone.
🔮 “We are very much in the mind for the western suburbs of Sydney,” One Nation MP Barnaby Joyce declared after the party won the Farrer byelection in May.
🔮 Police and PSOs would have the power to randomly search people anywhere in public with metal detectors, without needing a warrant or reasonable suspicion they have a weapon, under an election promise by Premier Ben Carroll.
Also by Patrick Hatch
One Nation candidate called to ‘decolonise’ Muslim lands
2026-10-15 · The Sydney Morning Herald
$285m COVID cover-up exposed by whistleblowers
2026-10-15 · The Sydney Morning Herald
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 10 articles by Patrick Hatch →
Angus Delaney
15 article(s) here · 1 carrying a prediction
🔮 If the polls are to be believed, law and order will be a decisive factor when voters decide on November 28 whether to turf Labor out.
🔮 That’s open until November 9 for people to nominate to be candidates and then our preferences will be done.”
🔮 Three Liberal sources, who spoke on the condition of anonymity to discuss confidential deliberations, said the state executive had realised the party could be dragged into the court case.
🔮 The government will on Thursday announce that the Arden Central renewal project in North Melbourne will be reserved almost exclusively for first-home buyers, with 74 per cent (4000 of 5400) of the planned new dwellings to be set aside for people trying to enter the market.
🔮 Labor will slash costs for foreign investors building homes in Victoria and review levies on overseas developers, as part of a renewed effort to roll back property taxes that industry chiefs have warned are holding back the state from meeting its housing targets.
🔮 In an apparent effort to defuse the scandal, Heavy Hire was told on Wednesday it would be removed from some state government sites.
🔮 Developers now have permission to convert a former orphanage into apartments in Surrey Hills that will rise above local height rules and to build a 15-storey apartment tower in Oakleigh three levels higher than the government’s own limit.
🔮 We will always operate absolutely within the confines of the law.”
🔮 Premier Ben Carroll will on Monday announce a funding commitment of $80 million over two years to kickstart work on building a second track on the Upfield line, which will slash wait times for commuters in suburbs including Broadmeadows, Dallas, Campbellfield and Fawkner.
🔮 The Nationals have pinned their hopes of retaining the state seat of Shepparton on a high-profile local mayor, as the Coalition braces for a fight to maintain its powerful foothold in the region.
Also by Angus Delaney
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 15 articles by Angus Delaney →

Topics

Broadmeadows Campbellfield Dallas Labor Melbourne

Subjects

Labor ORG · 6× Upfield GPE · 3× Brooks PERSON · 2× Carroll PERSON · 2× Gowrie GPE · 2× Melbourne GPE · 2× Ben Carroll PERSON · 1× Broadmeadows GPE · 1× Dallas ORG · 1× Daniel Andrews PERSON · 1×

Narrative

Although the $80 million will only be used for planning development, Carroll said “duplication has been spoken about for decades” and a re-elected Labor government would see the project built. “As a premier that spends taxpayer money wisely, I want to get the certainty on what duplication will cost.
framing: assertive · carried by 1 article(s) · first seen 2026-09-28
🔮 Premier Ben Carroll will on Monday announce a funding commitment of $80 million over two years to kickstart work on building a second track on the Upfield line, which will slash wait times for commuters in suburbs including Broadmeadows, Dallas, Campbellfield and Fawkner.
2026-09-28 · The Sydney Morning Herald
Level crossings on hold as Labor vows to fix Melbourne’s most unreliable train line · assertive framing

Claims (43 extracted, 3 hedged)

Labor has promised to duplicate Melbourne’s least reliable rail line and save taxpayers more than $600 million in major infrastructure works, while further delaying a signature policy of former premier Daniel Andrews. asserted
Labor → promise → Andrews
Premier Ben Carroll will on Monday announce a funding commitment of $80 million over two years to kickstart work on building a second track on the Upfield line, which will slash wait times for commuters in suburbs including Broadmeadows, Dallas, Campbellfield and Fawkner. asserted
which → announce → Broadmeadows
Currently, the four-kilometre stretch of track between Gowrie and Upfield stations is a single line, creating bottlenecks, preventing more trains from being run and leaving passengers experiencing substantial delays during peak periods. asserted
stretch → create → periods
Labor estimates duplicating the track will increase capacity by 50 per cent asserted
estimates → duplicate → cent
The promise will attempt to shore up support for Labor in its heartland northern suburbs seats, including Pascoe Vale, where the Greens believe they can win in November for the first time ever. asserted
they → attempt → time
The initial $80 million election pledge will be used to undertake site investigations, finalise project design and acquire relevant planning and environmental approvals. asserted
pledge → use → approvals
The government has not committed to a completion date for the project and said it will become clear after the initial development work is finished in 2028. asserted
work → commit → 2028
Treasurer Colin Brooks will also announce on Monday the delay of eight level crossing removals along the Upfield line to coincide with the track duplication and minimise costs and disruption. asserted
Brooks → announce → costs
Brooks said the decision to delay the removals was about “commonsense and timing” that would ultimately spare the state budget bottom line $686 million. asserted
that → say → million
The delay is another blow for residents in Melbourne’s north, who have been waiting for the level crossing removals since 2022 when Andrews promised the works would be completed by 2027. asserted
works → wait → 2027
Though the government later issued a new deadline of 2030, Labor now predicts the completion date to be in 2033 to coincide with the train line duplication works. asserted
date → issue → works
“We are making commonsense decisions to save money and minimise disruption along the Upfield Line,” Brooks said. asserted
Brooks → make → Line
“Labor will remove every one of the 110 level crossings we promised.” asserted
we → remove → crossings
Carroll said: “Doing it in one go reduces costs and minimises disruption for passengers. asserted
Doing → say → passengers
It’s common sense.” asserted
It → ’ → ?
The premier will also say that increasing frequency by duplicating the train line would have a substantial impact for commuters. asserted
increasing → say → commuters
“50 per cent more capacity on the line for turn-up-and-go services – that’s a huge change for the northern suburbs.” asserted
that → turn → suburbs
Although the $80 million will only be used for planning development, Carroll said “duplication has been spoken about for decades” and a re-elected Labor government would see the project built. “As a premier that spends taxpayer money wisely, I want to get the certainty on what duplication will cost. asserted
duplication → use → what
So we will delay several level crossings, then give Victorians certainty … and then we’ll get on, remove level crossings and duplicate the railway line at the same time,” he told reporters on Monday morning. asserted
he → delay → morning
While passengers on other metropolitan lines such as the Mernda, Sandringham, Glen Waverley, Cranbourne, Pakenham and Sunbury lines wait less than 10 minutes in peak hour, commuters on the Upfield line still face waits of 15 to 20 minutes during morning and afternoon peak periods. asserted
commuters → wait → periods
A train “turn-back” at Gowrie station, which would have made 10-minute frequencies possible, was planned as part of the Metro Tunnel project so Upfield trains could utilise new capacity in the City Loop, but it was cut from the $15 billion project to reduce costs. uncertain
it → make → costs
The Parliamentary Budget Office has costed the turn-back facility at $54.4 million. asserted
Office → cost → million
Geordie Barker, from the residents group Elevating Brunswick, said it was disappointing that the level crossing removals had been delayed. asserted
removals → say → group
However, he said the delay would allow time to improve designs of the new skyrail through the rapidly densifying section of Brunswick. asserted
delay → say → Brunswick
Barker’s group has been pushing for one of two new elevated stations to be built next to a vacant block of land, south of Hope Street, rather than north of Hope Street, where the platforms would be metres away from existing apartments. asserted
platforms → push → apartments
Tying them together is great, however, this is our third delay. asserted
this → tie → them
Daniel Andrews said this would be built by 2027,” he said. asserted
he → say → 2027
“We’ve had announcements like this before and really they need to commit to doing it properly. asserted
they → have → it
Improvements on the Upfield line have been considered long overdue by some public transport experts. asserted
Improvements → consider → experts
Infrastructure Victoria last year called on the government to duplicate the line, and Merri-bek Council has long campaigned for the government to commit to the upgrades. asserted
government → call → upgrades
Duplicating the line would cost about $245 million, according to Parliamentary Budget Office costings commissioned by the Greens in 2025, and provided to The Age at the time. uncertain
Duplicating → duplicate → time
That does not include about $50 million over a decade in operating and maintenance expenses. asserted
That → include → expenses
Infrastructure Victoria estimated duplicating the track and upgrading power and signalling along the entire line would cost $650 million to $1.4 billion, Carroll said on Monday. asserted
Carroll → estimate → Monday
Labor’s promise to upgrade the line may also shore up support in heartland northern-suburb seats. uncertain
promise → upgrade → seats
The Greens believe they can unseat Labor in Pascoe Vale, which the government holds on a slim 2 per cent margin. asserted
government → believe → margin
The duplicated train line will also benefit commuters closer to the city in the seat of Brunswick, which Labor hopes to win back from the Greens. asserted
Labor → duplicate → Greens
Greens candidate for Pascoe Vale Angelica Panopoulos said it was time the northern suburbs were given the same quality of public transport as commuters in other parts of the city. asserted
suburbs → say → city
“It shouldn’t take decades of advocacy from the community and Labor staring down the barrel of losing marginal seats to the Greens to finally move on this,” she said. asserted
she → take → this
Carroll struggles to break through with asserted
Carroll → struggle → ?
- NIMBY war: How median strips became the latest battlefront - Shepparton showdown: Can ‘handsome’ mayor hold back One Nation wave? - Pubs: Venues to stay open until 3am, and you can take your dog - asserted
you → become → dog
…and 3 more, not listed.
💬Give feedback
🕘History 🎫Support