Claims extracted
25
sentences that state something as happening or true
Uncertain
20%
5 of 25 hedged
("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
59/100
Times of India's corrections and
hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
1
Other
Same framing elsewhere
1
articles that frame the event the way this one does
A ferry has crossed the Connecticut River between Rocky Hill and Glastonbury since 1655, when the service began with a small raft pushed across the river using long poles.
asserted
service → cross → poles
Over the centuries, the ferry has changed from horse-powered and steam-driven vessels to its current operation.
asserted
ferry → change → operation
Today, the three-car Hollister III, an open flatboat, is towed across the river by the diesel-powered Cumberland.
asserted
III → tow → Cumberland
The Rocky Hill-Glastonbury Ferry operates from April through November, providing a direct river crossing for motorists, pedestrians and cyclists.
asserted
Ferry → operate → motorists
According to the Connecticut Department of Transportation, it is the oldest continuously operational ferry in the United States.
uncertain
it → accord → States
How the ferry changed from horsepower to a diesel towboat
The ferry has changed considerably since its early days.
asserted
ferry → change → days
At one point, horses on treadmills in the centre of the craft provided the power needed to move it across the river.
asserted
horses → provide → river
CTDOT's history of the ferry states that it was modernised in 1876, when the service moved to steam-driven craft.
asserted
service → state → craft
The ferry's current operation uses a different form of propulsion.
asserted
operation → use → propulsion
CTDOT describes today's vessel as an open flatboat named the Hollister III, which can carry three cars.
asserted
which → describe → cars
The barge is towed back and forth between the landings by Cumberland, a diesel-powered towboat.
asserted
barge → tow → Cumberland
Rocky Hill-Glastonbury Ferry schedule and fares
The ferry normally operates from April 1 through November 30.
asserted
ferry → operate → November
CTDOT lists operating hours of 7 a.m. to 6:45 p.m. from Monday to Friday, and 10:30 a.m. to 5 p.m. on Saturdays and Sundays.
asserted
CTDOT → list → Saturdays
The ferry is closed on Thanksgiving, and weather conditions, water levels or mechanical issues can affect service.
asserted
conditions → close → service
The ferry operates on demand rather than according to fixed departure times.
uncertain
ferry → operate → times
CTDOT states that there are "no scheduled departure times" and that service is provided as vehicles and passengers arrive.
asserted
vehicles → state → ?
Vehicles can board for $5 on weekdays and $6 on weekends, while pedestrians and cyclists pay $2 on all days, according to the department's current ferry information.
uncertain
pedestrians → board → information
PC: Connecticut Department of Transportation
How the ferry saves drivers nearly eight miles
asserted
ferry → save → miles
The ferry provides a direct connection between Rocky Hill and Glastonbury at Route 160.
asserted
ferry → provide → Route
CTDOT says motorists travelling between parts of southern Glastonbury and Rocky Hill can cut nearly eight miles one way from their journey by using the ferry.
asserted
motorists → say → ferry
The department also identifies the crossing as particularly important for cyclists.
asserted
department → identify → cyclists
Cyclists cannot use the Putnam Bridge on Route 2 between Wethersfield and northern Glastonbury, according to CTDOT.
uncertain
Cyclists → use → CTDOT
The department's ferry history page states that the Rocky Hill-Glastonbury Ferry is the only crossing available to cyclists between Hartford and Middletown, leaving a barrier of more than 13 miles without the ferry.
asserted
Ferry → state → ferry
High water near the landings delayed the April 1 start; CTDOT announced a May 1 opening.
uncertain
CTDOT → delay → opening
It was expected to welcome passengers through November.
asserted
It → expect → November