The Aporia
Rugaber, C. (2026, September 30). No criminal wrongdoing in $2.5Bn Federal building renovation but it was mismanaged, watchdog finds. The Independent. https://www.independent.co.uk/news/world/americas/fed-reserve-no-wrongdoing-jerome-powell-b3059269.html
Rugaber, Christopher. “No criminal wrongdoing in $2.5Bn Federal building renovation but it was mismanaged, watchdog finds.” The Independent, 30 Sept. 2026, https://www.independent.co.uk/news/world/americas/fed-reserve-no-wrongdoing-jerome-powell-b3059269.html.
Rugaber, Christopher. “No criminal wrongdoing in $2.5Bn Federal building renovation but it was mismanaged, watchdog finds.” The Independent, September 30, 2026. https://www.independent.co.uk/news/world/americas/fed-reserve-no-wrongdoing-jerome-powell-b3059269.html.
Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.
The Federal Reserve's inspector general released a 120-page report on September 30, finding no evidence of criminal wrongdoing but highlighting significant mismanagement in the $2.4 billion renovation project of its buildings in Washington, D.C., which began construction in 2022. The board failed to set up a comprehensive expenditure estimate or maximum total cost before starting work, leading contractors to face increased costs due to inflationary pressures. Former Fed Chair Jerome Powell requested the review last year. President Donald Trump seized on these findings, calling for Powell’s resignation amid his efforts to influence monetary policy. Republican Senator Tim Scott called the cost overruns "egregious" and promised rigorous oversight of the Fed, while current Chairman Kevin Warsh said he would follow the report's recommendations and hire an independent auditor to verify all awarded costs to date.