Photo via Dawn

Railways to outsource 13 passenger trains by December

Read the original at Dawn ↗
Cite

Hasnain, K. (2026, October 4). Railways to outsource 13 passenger trains by December. Dawn. https://www.dawn.com/news/2034543/railways-to-outsource-13-passenger-trains-by-december

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

Dawn · collected 2026-10-04 · by Khalid Hasnain

Quick Summary

Pakistan Railways plans to outsource operations of 13 express passenger trains, including Pak Business, by December 31. Minister Hanif Abbasi stated this is part of efforts to improve railway infrastructure and safety, along with replacing faulty equipment. The minister also noted that six trains are already operated commercially by private parties and aims for the railways to earn Rs120 billion in revenue from passenger and freight train operations by June 30.
Written by AI on 2026-10-04, from this article's own text only (the story summary below draws on all the coverage).

AI analysis

Story summary

The Pakistan Railways (PR) has decided to outsource 13 express passenger trains by December 2023. Currently, 6 trains are already operated commercially by private entities. The minister for railways, Hanif Abbasi, aims to maintain railway infrastructure and ensure safe train operations as per the prime minister's vision. This includes accelerating efforts to make faulty wagons operational and replacing faulty brake components. The plan also involves outsourcing luggage vans alongside passenger trains. The process of advertisement and contract award is underway to complete this initiative by December 31st, including trains such as Sandal, Allama Iqbal Express, Faiz Ahmad Faiz, Fareed Express, Sukkur Express, Babu Passenger, Bulleh Shah Passenger, Mohenjodaro Express, Lasani Express, Sialkot Express, Karachi Express, Bahauddin Zakariya Express and Tezgam.

Written for “Railway Outsourcing Plan” on 2026-10-31, grounded in this article and the 0 other(s) covering the same event.

Story

📰 Railway Outsourcing Plan
Economy/Business · 1 article(s) covering the same event.

Compared with similar articles

Nothing to compare against. No article is close enough to this one for the pipeline to have linked or judged the pair.
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
18
sentences that state something as happening or true
Uncertain
17%
3 of 18 hedged ("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
71/100
Dawn's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
1
Economy/Business
Same framing elsewhere
1
articles that frame the event the way this one does
Analyzed 2026-10-04 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

Dawn · 2470 article(s) · 3 correction(s) detected
Running correction rate · 3 correction(s)

Who wrote this

Khalid Hasnain
10 article(s) here · 1 carrying a prediction
🔮 The equipment will be installed at the flushing tunnels on both banks, the power intakes and the dam outlets.
2026-10-25 · assertive framing · Wapda inks Rs133bn deal for Diamer-Bhasha Dam project
🔮 “Till December 31, neither I nor the officers concerned will take rest.
🔮 He directed the authorities to ensure the provision of the best possible medical facilities to the injured passengers and said compensation would be paid to the deceased and injured in accordance with the Pakistan Railways insurance policy, as per the statement.
🔮 He directed the authorities to ensure the provision of the best possible medical facilities to the injured passengers and said compensation would be paid to the deceased and injured in accordance with the Pakistan Railways insurance policy, as per the statement.
🔮 He directed the authorities to ensure the provision of the best possible medical facilities to the injured passengers and said compensation would be paid to the deceased and injured in accordance with the Pakistan Railways insurance policy, as per the statement.
🔮 He directed the authorities to ensure the provision of the best possible medical facilities to the injured passengers and said compensation would be paid to the deceased and injured in accordance with the Pakistan Railways insurance policy, as per the statement.
🔮 The declared value, HS code, description, quantity and other shipment details in the Chinese export declaration could then be reconciled with the Pakistani goods declaration and supporting commercial documents, it suggested.
2026-10-07 · assertive framing · Power loom sector reels under imports, rising costs
🔮 According to the minister, the outsourcing of trains and luggage vans is also underway and 13 express passenger trains would be outsourced till Dec 31.
2026-10-04 · assertive framing · Railways to outsource 13 passenger trains by December
🔮 Revives earlier call for ‘system reset’, seeks support from business community “I will not speak more on this and I don’t want to go into detail, as there are many things and we achieved many of them.
🔮 The Flood Forecasting Division (FFD) of the Pakistan Meteorological Department on Saturday warned of inundation of the low-lying areas of seven Punjab cities due to possible rainfall on Sunday (today).
Also by Khalid Hasnain
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 10 articles by Khalid Hasnain →

Topics

Dawn LAHORE Pak Business Sandal The Pakistan Railways

Subjects

LAHORE GPE · 3× Abbasi PERSON · 2× Dawn ORG · 2× Allama Iqbal Express ORG · 1× Faiz Ahmad Faiz ORG · 1× Fareed Express ORG · 1× Hanif Abbasi PERSON · 1× Sandal ORG · 1× Sukkur Express ORG · 1× The Pakistan Railways ORG · 1×

Narrative

“At present, the commercial operation of six trains is being carried out by the private parties,” Mr Abbasi said, adding that the trains to be outsourced by December included Sandal, Allama Iqbal Express, Faiz Ahmad Faiz, Fareed Express, Sukkur Express, Babu Passenger, Bulleh Shah Passenger, Mohenjodaro Express, Lasani Express, Sialkot Express, Karachi Express, Bahauddin Zakariya Express and Tezgam.
framing: assertive · carried by 1 article(s) · first seen 2026-10-04
🔮 According to the minister, the outsourcing of trains and luggage vans is also underway and 13 express passenger trains would be outsourced till Dec 31.
2026-10-04 · Dawn
Railways to outsource 13 passenger trains by December · assertive framing

Claims (18 extracted, 3 hedged)

The Pakistan Railways (PR) has decided to outsource 13 express passenger trains, including Pak Business, and directed its officers to complete the process by December this year. asserted
Railways → decide → December
The department has also accelerated efforts to make all faulty (dummy) wagons fit for operation while taking action against the vendors who failed to supply parts on time. “It is the vision of the prime minister as well as mine to make all-out efforts to maintain the railway infrastructure for safe train operation. asserted
It → accelerate → operation
This is why I have assigned the officers concerned the task to accomplish the target of making all dummy coaches and wagons fit for operation,” Minister for Railways Hanif Abbasi explained while talking to Dawn. asserted
Abbasi → assign → Dawn
“I have also asked the officers to replace the faulty brake cylinders, blocks and shoes with new ones,” he added. asserted
he → ask → ones
According to the minister, the outsourcing of trains and luggage vans is also underway and 13 express passenger trains would be outsourced till Dec 31. uncertain
trains → accord → Dec
For this, the process, including the advertisement and award of the contract, would be completed soon. asserted
process → include → contract
“At present, the commercial operation of six trains is being carried out by the private parties,” Mr Abbasi said, adding that the trains to be outsourced by December included Sandal, Allama Iqbal Express, Faiz Ahmad Faiz, Fareed Express, Sukkur Express, Babu Passenger, Bulleh Shah Passenger, Mohenjodaro Express, Lasani Express, Sialkot Express, Karachi Express, Bahauddin Zakariya Express and Tezgam. asserted
trains → carry → Sandal
To a question, he said the railway bridge affected by the recent floods on Lahore-Faisalabad track would be rehabilitated within the next two months, helping railways to restore the rail traffic. asserted
railways → say → traffic
For the first time, according to him, the freight revenue exceeded the passenger revenue in the railways. uncertain
revenue → accord → railways
“I think, the railways would be able to earn revenue of Rs120bn from the passenger and freight train operations alone by the end of the ongoing fiscal year on June 30,” he hoped. asserted
he → think → June
Meanwhile, the minister presided over a meeting at the railway headquarters and directed the authorities to blacklist private vendors responsible for delays in the supply of equipment and materials. asserted
minister → preside → equipment
During the meeting, matters pertaining to railway operations, revenue generation, maintenance, security and outsourcing came under discussion. asserted
matters → pertain → discussion
Mr Abbasi directed the authorities to install modern CCTV cameras and deploy private security personnel at all railway workshops and yards to prevent theft. asserted
Abbasi → direct → theft
He said collective efforts were required to achieve the revenue targets set for the current financial year, adding that locomotives undergoing repairs should be restored to service according to the prescribed schedule. uncertain
locomotives → say → schedule
The minister ordered legal action against negligent officials. asserted
minister → order → officials
The meeting was also told by the officers concerned that advance planning was essential for ensuring transparency and improving the railway system. asserted
planning → tell → system
He further directed that the ongoing track renewal work in Sukkur division should be completed by Dec 31 as it would save operational time by around one-and-a-half hours. asserted
it → direct → hours
He also ordered that the flood-damaged Mian Kallar Bridge be completed within 60 days and repair of employees’ residential quarters in Lahore within two months. asserted
Bridge → order → months
💬Give feedback
🕘History 🎫Support