Photo via Toronto Star

LNG Canada to go ahead with Phase 2 expansion project in Kitimat, B.C.

Read the original at Toronto Star ↗
Cite

The Canadian Press. (2026, September 29). LNG Canada to go ahead with Phase 2 expansion project in Kitimat, B.C. Toronto Star. https://www.thestar.com/business/lng-canada-to-go-ahead-with-phase-2-expansion-project-in-kitimat-b-c/article_87b507a3-b7ab-5078-b138-376d73736d7e.html

Dated when The Aporia collected the article, usually within hours of publication. Check the original for its exact date and byline.

Toronto Star · collected 2026-09-29 · by The Canadian Press

Quick Summary

LNG Canada has announced plans to proceed with Phase 2 of its liquefied natural gas expansion project in Kitimat, British Columbia, which will increase capacity from the current level to 28 million tonnes annually. The expansion involves adding two new LNG processing units and related infrastructure. Chris Cooper, CEO of LNG Canada, highlighted that the project will create numerous jobs and enhance Canada’s standing as a reliable energy supplier. However, the report notes past operational issues with flaring exceeding permit limits during Phase 1, which have raised concerns among environmental groups and communities.
Written by AI on 2026-09-29, from this article's own text only (the story summary below draws on all the coverage).

AI analysis

Story summary

LNG Canada, a joint venture company consisting of Shell, Petronas, PetroChina, Mitsubishi Corporation, and Korea Gas Corp., has approved its Phase 2 expansion project in Kitimat, B.C. The expansion could double the production capacity to 28 million tonnes annually, up from the current 14 million tonnes. This multibillion-dollar initiative is expected to create thousands of jobs and enhance Canada's role as a global energy supplier. Prime Minister Carney will highlight this development in Vancouver on Tuesday, emphasizing it as a "historic investment" that underscores collaboration between governments, First Nations, local communities, and investors. The project also involves expanding the 670-kilometre Coastal GasLink pipeline to increase capacity for natural gas transport from northwestern Alberta and northeastern British Columbia to the Kitimat plant.

Written for “LNG Canada Expansion Approval” on 2026-10-31, grounded in this article and the 3 other(s) covering the same event.

Story

📰 LNG Canada Expansion Approval
Economy/Business · 4 article(s) covering the same event. Compare every outlet's account →

Compared with similar articles

This article reads unscored and hedges 0% of its claims. Each row says how that neighbour differs.
The Globe and Mail
Hedges 0 of 9 claims Outlet record 52/100
CBC News
⚖️ Leans left Hedges 2 of 21 claims Outlet record 74/100
Toronto Star
Hedges 4 of 39 claims Outlet record 64/100
How this article was measured signals, leaning charts, publisher record, byline, topics and claims

Signals How these are calculated →

Claims extracted
13
sentences that state something as happening or true
Uncertain
0%
0 of 13 hedged ("reportedly", "may", "according to")
Leaning
not political
takes no side on a contested political question
Publisher signals
64/100
Toronto Star's corrections and hedging, across everything collected from it. Not a measure of accuracy.
Outlets on this story
4
Economy/Business
Same framing elsewhere
2
articles that frame the event the way this one does
Analyzed 2026-09-29 · how these are computed

How this is being covered How these are calculated →

Article leaning vs. publisher reliability
Source leaning vs. consistency

Publisher

Toronto Star · 10784 article(s) · 28 correction(s) detected
Running correction rate · 28 correction(s)
2026-10-26
Correction
2026-10-24
Correction
2026-10-07
Correction
2026-09-24
Correction

Who wrote this

The Canadian Press
481 article(s) here · 1 carrying a prediction
🔮 Much of the eastern half of Canada switch their clocks back on Sunday, while the western half will not this year.
🔮 Prime Minister Mark Carney has laid out a timeline that would see Canada sign an agreement on a new partnership with the European Union in the next seven months, if all goes well.
🔮 She will play the winner of the late semifinal between Russia’s Diana Shnaider and Slovakia’s Mia Pohankova.
🔮 The listing recognizes the project’s critical role in expanding and diversifying Canada’s trade capacity and provides immediate regulatory certainty to move forward. Transport Minister Steven MacKinnon says it will add much-needed capacity at the country’s largest port. It also accelerates the project’s timeline for commercial operations by up to four years, to 2035. Ottawa says environmental safeguards will be maintained and Indigenous communities consulted.
🔮 OPP say the investigation is ongoing and anyone who may have witnessed the collision or has dashcam or surveillance footage from the area should contact them.
🔮 Russia’s potential return raises questions about how the tournament could accommodate another team, with schedules and other arrangements already in place.
🔮 Morneau will assume the role on Jan. 1, succeeding Katharine Stevenson, who is will retire from the board at the end of 2026.
2026-10-30 · assertive framing · Bill Morneau named as next CIBC board chair
🔮 Statistics Canada is set to release GDP figures for the month of August and its early estimate for September and the third quarter overall this morning.
🔮 OTTAWA - Statistics Canada is set to release GDP figures for the month of August and its early estimate for September and the third quarter overall this morning.
🔮 Scott Gillingham was re-elected as the mayor of Winnipeg on Wednesday after a campaign largely dominated by issues ranging from housing to public safety.
2026-10-29 · assertive framing · Scott Gillingham re-elected as mayor of Winnipeg
Wire or desk byline, not an individual reporter.
Also by The Canadian Press
Nothing else under this byline is closely related to this article, so these are simply their most recent.
All 481 articles by The Canadian Press →

Topics

B.C. Canada Kitimat LNG Canada VANCOUVER

Subjects

LNG Canada ORG · 7× Canada GPE · 2× Kitimat GPE · 2× B.C. GPE · 1× Chris Cooper PERSON · 1× Cooper PERSON · 1× First Nations NORP · 1× LNG Canada’s ORG · 1× Ottawa GPE · 1× VANCOUVER GPE · 1×

Narrative

“LNG Canada Phase 2 is another nation-building investment that demonstrates Canada can build big things when governments, First Nations partners, local communities, skilled trades, contractors and investors work together with shared purpose,” Cooper said in statement.
framing: assertive · carried by 2 article(s) · first seen 2026-09-29
🔮 LNG Canada says it will go ahead with the Phase 2 expansion project at its liquefied natural gas export terminal in Kitimat, B.C.
2026-09-29 · The Globe and Mail
LNG Canada to go ahead with Phase 2 expansion at Kitimat terminal · assertive framing
2026-09-29 · Toronto Star
LNG Canada to go ahead with Phase 2 expansion project in Kitimat, B.C. · assertive framing

Claims (13 extracted, 0 hedged)

LNG Canada says it will go ahead with the Phase 2 expansion project at its liquefied natural gas export terminal in Kitimat, B.C. asserted
it → say → Kitimat
The expansion will double LNG Canada’s capacity to 28 million tonnes a year. asserted
expansion → double → tonnes
It is one of the five initial projects that was referred to Ottawa’s major projects office last year. asserted
that → refer → office
LNG Canada CEO Chris Cooper says the project will create thousands of jobs and further strengthen Canada’s role as a trusted energy partner. asserted
project → say → partner
“LNG Canada Phase 2 is another nation-building investment that demonstrates Canada can build big things when governments, First Nations partners, local communities, skilled trades, contractors and investors work together with shared purpose,” Cooper said in statement. asserted
Cooper → demonstrate → statement
The company exports natural gas that is piped from northwestern Alberta and northeastern British Columbia to the plant in Kitimat, where it is chilled into a liquid state and then loaded onto specialized tankers bound for Asian markets. asserted
it → export → markets
The expansion will build on the footprint and infrastructure of the first phase of the project, which began shipping liquefied natural gas last year. asserted
which → build → gas
It will add two additional LNG processing units, known as trains, as well as an additional LNG storage tank, condensate tank, loading berth, and expanded utility and process systems. asserted
It → add → trains
LNG Canada also said it is working with Coastal GasLink to expand the capacity of the existing 670-kilometre pipeline through the construction of five new compressor stations. asserted
it → say → stations
The first phase of LNG Canada has been beset by equipment issues that have resulted in flaring in excess of what’s allowed under its permits. asserted
what → beset → permits
Flaring is the controlled burning of natural gas for safety reasons. asserted
Flaring → control → reasons
The LNG Canada partners have said it’s a normal part of project startup, but environmental and community groups have raised concerns about the health and safety impacts. asserted
groups → say → impacts
This report by The Canadian Press was first published Sept. 29, 2026. asserted
report → publish → Press
💬Give feedback
🕘History 🎫Support